AAS 197, January 2001
Session 12. Hubble Space Telescope: Instruments and Data Reduction
Display, Monday, January 8, 2001, 9:30am-7:00pm, Exhibit Hall

[Previous] | [Session 12] | [Next]


[12.20] Resistance is Futile: STScI's Science Planning and Scheduling Team Switches From VMS to Unix Operations

D.S. Adler (CSC/STScI)

The Science Planning and Scheduling Team (SPST) of the Space Telescope Science Institute (STScI) has historically operated exclusively under VMS. Due to diminished support for VMS-based platforms at STScI, SPST is in the process of transitioning to Unix operations. In the summer of 1999, SPST selected Python as the primary scripting language for the operational tools and began translation of the VMS DCL code. As of October 2000, SPST has installed a utility library of 16 modules consisting of 8000 lines of code and 80 Python tools consisting of 13000 lines of code. All tasks related to calendar generation have been switched to Unix operations. Current work focuses on translating the tools used to generate the Science Mission Specifications (SMS). The software required to generate the Mission Schedule and Command Loads (PASS), maintained by another team at STScI, will take longer to translate than the rest of the SPST operational code. SPST is planning on creating tools to access PASS from Unix in the short term. We are on schedule to complete the work needed to fully transition SPST to Unix operations (while remotely accessing PASS on VMS) by the fall of 2001.


The author(s) of this abstract have provided an email address for comments about the abstract: adler@stsci.edu

[Previous] | [Session 12] | [Next]